Log in Request access

Use Howard where uncertainty is expensive.

The best question changes with the design phase. Before CAD, it is “Which architecture deserves geometry?” At review, it is “Which assumption can fail this design?” After test, it is “What changed, and what must be recomputed?”

Request access

Three phases, one thread

  1. 01

    Before CAD

    Turn a loose brief into measurable requirements, architecture options, kill criteria, first-order checks, and a plan for the unknowns.

    Make the expensive decisions earlier →
  2. 02

    During and after CAD

    Challenge the thermal path, load cases, material conditions, joints, seals, manufacturing assumptions, and tolerance-sensitive interfaces around the model.

    Review the engineering behind the geometry →
  3. 03

    Test and revision

    Convert chamber, drop, cycle, prototype, and supplier evidence into a controlled update of assumptions, calculations, and open risks.

    Turn failed tests into a better revision →

One argument across every phase.

Requirements should not disappear into CAD notes. Calculations should not detach from the condition they assumed. Test results should not become isolated slides. Howard keeps the decision history connected.

Tell us where your project is stuck.